<ruby id="h6500"><table id="h6500"></table></ruby>
    1. <ruby id="h6500"><video id="h6500"></video></ruby>
          1. <progress id="h6500"><u id="h6500"><form id="h6500"></form></u></progress>

            Bug

            上一篇 / 下一篇  2009-02-26 10:24:30 / 個(gè)人分類(lèi):測試類(lèi)

             
            MILY: 'Myriad Web'; mso-ascii-font-family: 'Myriad Web'; mso-fareast-font-family: 宋體; mso-hansi-font-family: 'Myriad Web'; mso-fareast-language: ZH-CN">

            We are going to introduce following:

            §       1. What is a Bug

            §       2. The Bug elements

            §       3. The life cycle of a Bug

             

             

             What is a bug?

            1.  A formatted form. can managed

            2. Reflect an existing issue

            3. The Carrier of Communication

            4. Quality track bases

            5. Workload measure

            6. Case measure

             

             

            Why bug is a formatted form. can managed?

            Put all involved people at same page by a specific format:

            • Easy write by QA with same template
            • Easy read by Dev. with same template
            • Easy to classify for time saving
            • Easy to assign resources
            • Easy to track
            • Easy to analysis
            • Easy to communicate

             

             

            How bug reflect an existing issue?

            Included all required information to it clearly:

            • Number
            • Type
            • Reporter
            • CC List
            • Assigner
            • Product information
            • Status and Resolution
            • Priority and Severity
            • Content
            • Flags
            • Summary
            • Environments
            • Build Version
            • Parameters and Data
            • Pre-configuration
            • Steps
            • Expected result
            • Actual result
            • Workaround
            • Attachment
            • Related bugs
            • Dev. comments
            • QA comments
            • Management comments

             

             

            What be carried in communication?

            All information that used to fix and track bug:

            • The all required information to reproduce the issue
            • The Dev. fixing information
            • The QA provided additional information
            • The QA verification information
            • The status information
            • The handling information

             

             

            When track quality base on bug?

            If the bugs affect the original test plan in progress:

            • Bug is missed
            • Bug is a blocker
            • Too many bugs were found in specific functional area
            • Too many reopening happened
            • Resources changed
            • After functional testing and before regression testing
            • After a new version released
            • Before a plan be made(*)

             

            Whose workload can measure?

            Measuring different roles’ workload before and after milestone:

            • Fixed rate
            • Fixed time
            • Fixed quantity
            • Reported rate
            • Reported quality
            • Reported quantity

             

            Where measure the case base on bug?

            • The case quality
            • The case quantity
            • The case deep
            • The case span
            • The case priority
            • The case severity

             

            The life cycle of a Bug

             

            Phase:

            • Opening ( New, Assigned, Reopened and Resolved)
            • Closed (Verified and Closed)

             

            Role:

            • QA – Assigned, Resolved, Verified and Closed
            • Dev. – New, Assigned and Reopened 

             


            TAG: bug BUG Bug

             

            評分:0

            我來(lái)說(shuō)兩句

            顯示全部

            :loveliness: :handshake :victory: :funk: :time: :kiss: :call: :hug: :lol :'( :Q :L ;P :$ :P :o :@ :D :( :)

            我的欄目

            日歷

            « 2011-05-24  
            1234567
            891011121314
            15161718192021
            22232425262728
            293031    

            我的存檔

            數據統計

            • 訪(fǎng)問(wèn)量: 2542
            • 日志數: 7
            • 文件數: 1
            • 建立時(shí)間: 2009-02-26
            • 更新時(shí)間: 2009-02-26

            RSS訂閱

            Open Toolbar
            老湿亚洲永久精品ww47香蕉图片_日韩欧美中文字幕北美法律_国产AV永久无码天堂影院_久久婷婷综合色丁香五月
              <ruby id="h6500"><table id="h6500"></table></ruby>
              1. <ruby id="h6500"><video id="h6500"></video></ruby>
                    1. <progress id="h6500"><u id="h6500"><form id="h6500"></form></u></progress>